page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42
page 43
page 44
page 45
page 46
page 47 page 48
page 49
page 50
page 51
page 52
page 53
page 54
page 55
page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77
page 78
page 79
page 80
page 81
page 82
page 83
page 84
page 85
page 86
page 87
page 88
page 89
page 90
page 91
page 92
page 93
page 94
page 95
page 96
page 97
page 98
page 99
page 100
page 101
page 102
page 103
page 104
page 105
page 106
page 107
page 108
page 109
page 110
page 111
page 112
page 113
page 114
page 115
page 116
page 117
page 118
page 119
page 120
page 121
page 122
page 123
page 124
page 125
page 126
page 127
page 128
page 129
page 130
page 131
page 132
page 133
page 134
page 135
page 136
page 137
page 138
page 139
page 140
page 141
page 142
page 143
page 144
page 145
page 146
page 147
page 148
page 149
page 150
page 151
page 152
page 153
page 154
page 155
page 156
page 157
page 158
page 159
page 160
page 161
page 162
page 163
page 164
page 165
page 166
page 167
page 168
page 169
page 170
page 171
page 172
page 173
page 174
page 175
page 176
page 177
page 178
page 179
page 180
page 181
page 182
page 183
page 184
page 185
< prev - next > Energy Hydro power civil_works_guidelines_for_micro_hydro (Printable PDF)
CIVIL WORKS GUIDELINES FOR MICRO-HYDROPOWER IN NEPAL
45
Box 4.5 The formers method for lining canals
The method developed by Practical Action in Peru and
described here is generally known as the ‘formers method’
for constructing canals. The formers method permits savings
in time and material in constructing concrete channels by
reducing the need for pouring concrete into conventional
formwork. Precise placement of formers and lines tied
between them enable the concrete to be plastered to the
insides of the trench and finished with a trowel (see Figure
4.4).
The method involves placing a
layer of concrete on the bottom
and sides of the canal to form a
uniform thickness and a smooth
finish. Levelling and finishing the
surface is done according to the
former.
of oil or petrol is placed on the formers before carrying
out the lining. This also assists with the preservation
of the formers. Care should be taken to avoid damage
to the edges of the lining when the formers are taken
out.
Curing the concrete. To reach the required strength
and durability, fresh concrete should be cured. This is
achieved by filling the surrounds with water so that
Procedure
Setting out for the formers.
Locate pegs every 10 metres Figure 4.4 Formers method of lining canals.
in straight sections and every
5 metres in curved sections, taking into account the
the linings remain soaked for a period of a minimum
slope of the design. It is preferable to use a builder’s
of 10 days. This is easy to carry out by locating turns or
level to achieve the required precision.
earth banks at each end, which retain the water. During
Fixing the formers. Locate formers on each peg at right
rainy periods a spillway can be formed to allow excess
angles to the centreline of the canal, vertical and exactly
water to escape, which will also offer a check on the
in line. They are fixed to the pegs using No. 16 gauge
slope. The curing of concrete is very important and
wire and nails, after which intermediate formers are
should not be overlooked.
located every 2.5 metres in straight sections, the
Expansion joints. Expansion joints are required in the
required slope being checked with a pipe level to give
spaces that are left when the formers are taken out
5 mm drop every 2.50 metres (a slope of 2 in 1000).
every 2.5 metres in straight sections and variable in
Each former is checked for line, level, that it is
curved sections. These permit the concrete to expand
perpendicular to the canal centreline and fixed firmly.
and contract without cracking the linings. To fill the
Lining the canal. Prepare a 1:1.5:3 concrete mix
joints the following work is required:
After making the dry mix, turning the mix a
a) Clean the joints of debris and unwanted materials
minimum of three times to mix thoroughly, add water,
with an angular palette whose dimensions are
which should have a quantity no greater than one-
suitable for the width of the joint.
half of the total weight of the cement (i.e. for mix
b) Prime the inside surface of the joint with a solution
with 1 kg of cement put ½ litre of water). Next the
of tar with kerosene in proportions 1:3 so that it
sides of the canal are plastered and compacted. The
has the viscosity of paint. This solution should be
pegs are taken out after the finish is completed. Then
applied with a brush.
fine sand is sprinkled with cement to give a mix of
c) Place a hot mix of tar with fine sand, in proportions
1:3 and a plastering board is used to give a smooth,
of 1 can of tar to 4 cans of sand. First heat the tar
impermeable finish to the lining. When the sides of
and then gradually add the sand while mixing
the canal are completed the same procedure is
until it has the consistency of black sugar. This
followed for the bottom. To finish the edges, care is
mixture is placed first at the sloping sides of the
required to ensure that the formers remain in line.
channel and then at the bottom. It is placed in
They should be checked using a cord or rule.
layers and compacted with the angular palette.
Extracting the formers. Formers are taken out after 24
The finished level of the joint should not exceed
hours in cold climates. To make extraction easy, a layer
the level of the canal lining.